Disputes

Fair for both sides, with an engineer and a full record

Only the disputed amount is frozen. An independent engineer decides on facts, and either side can take the full case file to court.

How a dispute works

01

Hold with a reason

Either side flags the lines in question with photos. Accepted lines are paid as usual; only the disputed amount is frozen.

02

Two rounds of rework

The contractor fixes the lines and hands them over again. Most disputes end here.

03

Order an independent engineer

Either side can order a site visit by a partner engineering firm, from AED 1,200. The engineer compares the work with the signed scope, drawings and photos.

04

The engineer gives a written conclusion

Line by line: done, rework needed, or a price adjustment. If both sides accept, the money moves as written and the fee is paid by the side found wrong.

05

Still disagree? Take the case further

Choose “I don’t agree” and download the full case file: contract, scope, drawings, photos, messages, timeline and the engineer’s report. The disputed amount stays frozen for 30 days so you can file with Dubai Courts, a mediator or arbitration.

06

Release follows the decision

Upload the filing within 30 days and the money stays frozen until a court, mediator or both sides decide. No filing, and the engineer’s conclusion applies.

Both sides have the same tools

For owners

  • Hold any line that is not right
  • Order the engineer yourself
  • Download the case file and open a claim against the contractor

For contractors

  • Challenge a hold you think is unfair
  • Order the engineer to confirm the work is done
  • Download the case file and open a claim against the owner

DealBridge is not a court or an arbitrator. We keep the record, freeze the disputed amount and follow the engineer’s conclusion or a decision you show us. Engineering firms are independent partners.

Start your first protected deal